I.M.I., Inc.
Frederick, MD 21701
Featured Project Return to Projects List
Emergency Generator Replacement - John Adams Building / Library of Congress
Project Information
- Project Location:
- Washington, DC
- Status:
- In-Progress - Apr 2015
- Structure Type:
- Government
References
- Owner:
- Architect of the Capitol
- Architect:
- Westlake Reed Leskosky
- General Contractor:
- IMI, Inc.
- Client:
- Fred Witcher - Contracting Officer Architect of the Capitol
Scope Of Work
Demolition and removal of existing emergency power system, including generator and associated electrical disytribution system.
Site excavation, Installation of shoring system
Installation of underground concrete vault approximately 60 ft x 40 ft x 20 ft deep
Relocation of ex. fiber optic communication and camera surveillance camera control and power systems
Interior Lead Base Paint and Asbestos abatement & disposal
Waterproofing
Installation of a 5000 gal. underground fuel tank and fuel distribution system, inclusive of fuel pumps and controls.